Installing Your Fiberglass Pool

Let us walk you through one of our installations...

1. We will deliver your pool to your home with the pool ready to be installed. Installation Step 1: we deliver your pool to your home with the pool ready to be installed.
2. We will lay the pool out in your yard where you want it to be installed. Installation Step 2: We will lay the pool out in your yard where you want it to be installed.
3. The same day we will dig the hole, checking elevation and matching it to the pool you chose. Installation Step 3: The same day we will dig the hole checking elevation and matching it to the pool you chose.
4. After digging is complete, we will place the bed of masonry sand on the floor of the pool. Installation Step 4: After digging is complete we will place the bed of masonry sand on the floor of the pool.
5. Next, we will place the pool in its location making certain that the pool is level. If it is not, we will lift the pool out and re-groom the leveling sand until it meets industry standards. Installation Step 5: Next, we will place the pool in its location making certain that the pool is level. If it is not, we will lift the pool out and re-groom the leveling sand until it meets industry standards.
Installation Step 5: Next, we will place the pool in its location making certain that the pool is level. If it is not, we will lift the pool out and re-groom the leveling sand until it meets industry standards.
6. After pool is set, we begin backfilling with masonry sand using water to compact the sand at the same time we fill the pool with water. Installation Step 6: After pool is set, we begin backfilling with masonry sand using water to compact the sand at the same time we fill the pool with water.
7. After pool is filled with water and backfilled, plumbing will begin with all necessary equipment put in place for the function of your pool. Installation Step 7: After pool is filled with water, backfilled plumbing will begin with all necessary equipment put in place for the function of your pool.
8. Once plumbing is completed and pool is running, the forming of the concrete deck around the pool will begin. Installation Step 8:  Once plumbing is completed and pool is running, the forming of the concrete deck around the pool will begin.
9. Next step is the pouring of the concrete. Installation Step 9:	Next step is the pouring of the concrete.
Installation Step 9:	Next step is the pouring of the concrete.
10. Last, the job is now complete with the concrete down and pool cleaned. All in 14 days or less. Installation Step 10:  Last, the job is now complete with the concrete down and pool cleaned. All in 14 days or less.
11. Of course there are certain circumstances that are outside of our control that may prolong the installation process. Some examples are:
  • Permit delays
  • Inclement weather
  • Poor soil conditions
  • Delayed inspection schedules